Apr 01, 2021

New energy vehicle charging pile production line DC charging pile assembly line

Leave a message

DC charging pile assembly production line; charging pile production line; charging pile assembly line; charging pile assembly line; charging pile assembly line 50m. The front section is 1 machine assembly line, and the rear section is 2 denso lines. The storage and distribution are realized through the buffer area and shunt conveying module in the middle section; 2) The machine assembly line is composed of 1 loading station and 4 process stations. , The intermediate buffer area can store 5 charging piles, each electrical equipment line has 1 transition station, 5 process stations, 1 inspection station and 1 offline station, and each inspection station can be placed 2 Charging piles; 3) The assembly line uses electric double-row heavy-duty roller station modules to automatically transport the tooling pallets loaded with charging piles, and automatically moves the charging piles to the assembly station on the assembly line. The line bodies are automatically moved through the up and down lifting modules. Upper and lower parts; 4) The working surface of the electric double-row heavy-duty drum is 200mm from the ground, and the conveying speed V=5m/min; 5) The compressed air pipeline is set inside the whole line, and the corresponding position of each vital part is reserved.


Wenling Wanxin Industrial Equipment Manufacturing Co., Ltd. is currently committed to the research and development, production, and integration of automation equipment in the power, motor, elevator, logistics, and automobile industries. Provide comprehensive and comprehensive production automation solutions for new and old customers in the fields of high and low voltage switch cabinets, vacuum circuit breakers, motors, and new energy vehicles.


Send Inquiry